Advanced 5 level in-line baggage handling system with explosives
detection technology for greater efficiency and security.
Terminal 3 has state-of-the-art complex featuring Common Use Terminal Equipment (CUTE)
The arrival hall features both standard and wide-body baggage reclaims belts
Two tier terminal building featuring the departure complex on the upper level and the arrivals at the lower level.
New terminal can be accessed by a 6 lane approach road and a dedicated high-speed Metro line from the City-Centre.
The third runway is amongst the longest in Asia with a capacity to handle an A380-size aircraft.
Access to the aircraft from the terminal is provided by 4 piers.
For International passengers more than 95 desks for fast and smooth immigration procedures.
The roof of the building has stylized incisions to allow daylight and angled to protect the interior from direct sunlight creating an ambience maximizing the sense of volume, space and light inside.
Optimal use of natural light in daytime reduces dependence on artificial light
Over 168 counter in the check-in area to speed up check-in and security clearances unobtrusively.